Aerial View of Chapel The showcase of our campus has received a complete renovation.  The entire interior has been repainted, and all icons were cleaned and/or restored. A new imported marble floor was installed, and the aging pews were replaced with hand-carved Byzantine chairs. 

The roof has been repaired.  The entire Chapel has been re-pointed, replacing damaged brick & bluestone.  The oil heating system was removed and replaced with a natural gas boiler with duel fuel usage capabilities. 

The narrow asphalt road and walkway was removed, and replaced with brick.  The road has been widened from 9 feet to 14 feet.    The flagstone patio and fountain have been repaired.  The concrete wall was refaced with flagstone.   The mahogany doors were removed and professionally refinished.  A handicapped ramp was installed.  Road and walkway lighting was replaced.  A new irrigation system was installed to maintain this beautifully landscaped area.   